Choose Construction Plan

Start your project with ease. No credit card is required.

Standard

  •  Steel TMT Bars: Bhushan TMT, Amba TMT 550 Grade, or Equivalent

  •  Dust: Standard Dust with Stone Grains

  •  Sand: Yamuna Sand

  •  Bricks: 1st Class Hand Molded in Traditional Kiln

  •  Gravels or Aggregates: Standard Rodi (M-20)

  •  Door Frames: Maranti Wood Frames, Japanese Steel

  •  Cement: ACC Cement, Birla Cement, or Equivalent

  •  Water Tank: 3 Layered Water Tank 1000 Liters per Floor

  •  Railing: Front Balcony Railing in M.S.

  •  Plumbing Conduiting: Prince Pipes, Ashirwad Pipes, or Equivalent

  •  Electrical Conduiting (Heavy uPVC Material)

  •  Waterproofing: Dr. Fixit (2 Coats) of Waterproofing in Terrace, Balcony & Toilets

  •  Miscellaneous Items

 

Construction Details:

  • Plaster Work: Ratio of 1 Cement: 4 Sand

  • Earthuake-safe: Steel binding, 1:1.5:3 concrete mix ratio.

  • Brickwork: Ratio of 1 Cement: 4 Dust

  •  Labor: Civil, Electrical, Plumbing, and Excavation labor included in the scope

  • Foundation: Up to 5ft with 1:1.5:3 column footing ratio.

  • Basement Foundation: As per Structure Designer's Specifications (Raft/Pile)

  • Raised Platform/Ground Floor Plinth Level: Up to 2'6" Considered

Superior

  •  Steel TMT Bars: Rathi TMT Bars, or Equivalent

  •  Dust: Standard Dust with Stone Grains

  •  Sand: Yamuna Sand

  •  Bricks: 1st Class Hand Molded in Traditional Kiln (Coal Burnt)

  •  Gravels or Aggregates: Standard Rodi

  •  Door Frames: Maranti Wood Frames (Sagwan upto - 2200 Ru.Ft.)

  •  Cement: ACC Cement, Birla Cement, or Equivalent

  •  Water Tank: 3 Layered Water Tank 1000 Liters per Floor

  •  Railing: Front Balcony Railing in Stainless Steel

  •  Plumbing Conduiting: Kissan Pipes, Prakash Pipes, or Equivalent

  •  Electrical Conduiting (AKG / Setia)

  •  Waterproofing: Dr. Fixit (2 Coats) of Waterproofing in Terrace, Balcony & Toilets

  •  Miscellaneous Items

Construction Details:

  • Plaster Work: Ratio of 1 Cement: 4 Sand

  • Earthuake-safe: Steel binding, 1:1.5:3 concrete mix ratio.

  • Brickwork: Ratio of 1 Cement: 4 Dust

  •  Labor: Civil, Electrical, Plumbing, and Excavation labor included in the scope

  • Foundation: Up to 5ft with 1:1.5:3 column footing ratio.

  • Basement Foundation: As per Structure Designer's Specifications (Raft/Pile)

  • Raised Platform/Ground Floor Plinth Level: Up to 2'6" Considered

Premium

 

  • Steel TMT Bars: TATA Tiscon, Kamdhenu, Jindal TMT Bars or Equivalent

  •  Dust: Standard Dust with Stone Grains

  •  Sand: Yamuna Sand

  •  Bricks: 1st Class Hand Molded in Traditional Kiln (Coal Burnt)

  •  Gravels or Aggregates: Standard Rodi

  •  Door Frames: Ivory Teak Wood

  •  Cement: Ultratech Cement, Shree Cement, or Equivalent

  •  Water Tank: 3 Layered Water Tank 1000 Liters per Floor

  •  Railing: Front Balcony Railing in Stainless Steel

  •  Plumbing Conduiting: Supreme Pipes, Astral Pipes, or Equivalent

  •  Electrical Conduiting: Norpack, Polycab

  •  Waterproofing: Asian (2 Coats) of Waterproofing in Terrace, Balcony & Toilets

  •  Miscellaneous Items

Construction Details:

  • Plaster Work: Ratio of 1 Cement: 4 Sand

  • Earthuake-safe: Steel binding, 1:1.5:3 concrete mix ratio.

  • Brickwork: Ratio of 1 Cement: 4 Dust

  •  Labor: Civil, Electrical, Plumbing, and Excavation labor included in the scope

  • Foundation: Up to 5ft with 1:1.5:3 column footing ratio.

  • Basement Foundation: As per Structure Designer's Specifications (Raft/Pile)

  • Raised Platform/Ground Floor Plinth Level: Up to 2'6" Considered